Блок-бокс технологический

Purpose

Modular Process Control Buildings are designed to accommodate process control equipment, electrical equipment, monitoring and control cabinets, electronic control and secondary instrument boards, a computer work station for a process control operator, as well as office premises for process facilities personnel. 

Overview

Блок-бокс технологический1.jpg

Specifications

This modular building is a heated facility provided with a power-supply system, ventilation, air-conditioning (if required), water-supply, sewerage and heating (electrical or hot-water) systems. The building exterior is made of corrugated steel sheets, while MDF boards and sandwich panels are used for the interior. The heat insulating material used is rock wool, the floor insulation is by means of cement bonded particle boards covered with linoleum, and the roofing is sheet metal. 

These Process Control Buildings are modular facilities made up of modules measuring 3х6х2.95m, 3х9х2.95m, 3х12х2.95m that can be joined together and fitted out with any specific equipment required by the Customer and the Designer.

They are fully customizable to accommodate your wishes with regard to dimensions, floor space, layout, interior finish, furniture and equipment.

These Modular Process Control Buildings are manufactured in accordance with the technical regulations “On the Safety of Machinery and Equipment”.

Ordering Information:
Process Control Building 9х3х2.95m as per TU 5363 012 56562997 2004

Technical Data
Dimensions

Overall dimensions

in mm

Width

from 2 200 to 3 000

Length

3 000, 4 000, 6 000, 9 000 and 12 000

Ceiling height

2 200 and 2 475

Building height

2 400, 2 950 and 3 750

Estimated weight 3 000 х 6 000, min, kg

5 000

Process Control Building (Example)

Блок-бокс технологический2.jpg

 

 

Specification

Item

Name

1

Control room

2

Dining room

3

Drying for safety overalls

4

Locker room

5

WC

6

Shower room

7

Room for emergency fire-fighting equipment and for PPE

8

Airlock door entry

9

Lobby

10

Process room lobby

11

Process area

12

Smoking lounge with ventilation system

13

Sample storage room

14

Vido monitoring console area